A Quality-Control Checklist for Hardware Installation

Even the best hardware performs poorly if installed badly. This checklist walks through the key steps, from preparation to handover.

Installation17 August 20267 min read
A Quality-Control Checklist for Hardware Installation

01Before installation

  1. 1Check the carcasses are square: both diagonals should match (within 1–2 mm).
  2. 2Check the floor is level and the legs or plinth are correctly set.
  3. 3Match drawings and the hardware schedule against delivered parts — codes, quantities, left and right versions.
  4. 4Keep each part’s technical datasheet at hand, especially drilling dimensions and clearances.

02The right tools

  • Drilling jigs for hinges and slides — more accurate and faster than manual measuring
  • A 35 mm hinge-cup bit with a depth stop
  • A laser level to align rows of cabinets and runners
  • A cordless driver with torque control, so screws are not overtightened and board threads are not stripped

03During installation

  1. 1Use the screws specified for each part and for the board material.
  2. 2Drill hinge cups to the exact depth; too deep weakens the door.
  3. 3Fix left and right runners level and at the same height.
  4. 4Check power and lighting cable routes before fitting shelves and backs.

04After installation

  1. 1Align every door using the hinges’ 3D adjustment.
  2. 2Open and close every door and drawer at least ten times to confirm soft-close and smooth travel.
  3. 3Test drawers under real load and check for sagging or play.
  4. 4Test sensors, lights and motorised mechanisms several times.
  5. 5Clean all surfaces and remove temporary protection.

05Handover

Give the client a short care guide and a list of the hardware used. It simplifies after-sales service and shows the precision of the installation team.

Quality lives in the details nobody is supposed to notice.