A Quality-Control Checklist for Hardware Installation
Even the best hardware performs poorly if installed badly. This checklist walks through the key steps, from preparation to handover.
.jpg)
01Before installation
- 1Check the carcasses are square: both diagonals should match (within 1–2 mm).
- 2Check the floor is level and the legs or plinth are correctly set.
- 3Match drawings and the hardware schedule against delivered parts — codes, quantities, left and right versions.
- 4Keep each part’s technical datasheet at hand, especially drilling dimensions and clearances.
02The right tools
- Drilling jigs for hinges and slides — more accurate and faster than manual measuring
- A 35 mm hinge-cup bit with a depth stop
- A laser level to align rows of cabinets and runners
- A cordless driver with torque control, so screws are not overtightened and board threads are not stripped
03During installation
- 1Use the screws specified for each part and for the board material.
- 2Drill hinge cups to the exact depth; too deep weakens the door.
- 3Fix left and right runners level and at the same height.
- 4Check power and lighting cable routes before fitting shelves and backs.
04After installation
- 1Align every door using the hinges’ 3D adjustment.
- 2Open and close every door and drawer at least ten times to confirm soft-close and smooth travel.
- 3Test drawers under real load and check for sagging or play.
- 4Test sensors, lights and motorised mechanisms several times.
- 5Clean all surfaces and remove temporary protection.
05Handover
Give the client a short care guide and a list of the hardware used. It simplifies after-sales service and shows the precision of the installation team.
Quality lives in the details nobody is supposed to notice.